Home
  • Home
  • About us
  • Business
  • Equipment
  • Achievements
  • Contact us

  • Introduction
  • Corporate Culture
  • Organization
  • Certificates
  • Subsea Pipeline Laying
  • Subsea Trenching
  • Subsea Cable Laying
  • Platform Installation
  • Pipeline Landing
  • Junhao3 Laying Barge
  • Main Equipment
  • Contact way
  • Send mail
·中文 ·English

此页面上的内容需要较新版本的 Adobe Flash Player。

获取 Adobe Flash Player

Home > Subsea Pipeline Laying

  • Subsea Pipeline Laying
  • Subsea Trenching
  • Subsea Cable Laying
  • Platform Installation
  • Pipeline Landing

Subsea Pipeline Laying

   The company owned a multifunctional shallow pipe-laying vessel" Junhao 3". The ship is equipped with special sea pipe laying operation line, welding and hoisting and pressure test equipment. The contract can be within the depth of 25 meters, the subsea pipe laying, expansion bend installation, pipeline pressure test work.
   Pipe laying operation equipment capacity:
   Tensioner tension : 50t;
   Tensioner maximum through diameter: 1500mm;
   A / R winch pull : 50t;
   Lifting capacity: Max. 150t;
   Welding equipment: 3 sets of STT welder ( Lincoln ), 8 DC400 ( Lincoln );
   Pipe laying line consists of 6 stations: 1 preprocessing station, 3 welding station, 1 inspection station, 1 preservative station.
  • JZ9-3W Flexible Pipe Laying Engineering
  • NP1-29P & NP1-2D Subsea Riser Installation Engineering
  • SZ36-1 1 Adjustment Project Expansion Bend Installation Engineering
  • SZ36-1ⅠAdjustment Project: Spool Piece Installation
  • SZ36-1ⅠAdjustment Project: Spool Piece Installation
Pager.total 上一页 1 下一页
Enter Web-mail |  Equipment |  Contact us 

Copyright ©2011 Tianjin Junhao Offshore Engineering Co., Ltd. Tianjin ICP 09013223, Network brand:Qiudi