The company owned a multifunctional shallow pipe-laying vessel" Junhao 3". The ship is equipped with special sea pipe laying operation line, welding and hoisting and pressure test equipment. The contract can be within the depth of 25 meters, the subsea pipe laying, expansion bend installation, pipeline pressure test work.
Pipe laying operation equipment capacity:
Tensioner tension : 50t;
Tensioner maximum through diameter: 1500mm;
A / R winch pull : 50t;
Lifting capacity: Max. 150t;
Welding equipment: 3 sets of STT welder ( Lincoln ), 8 DC400 ( Lincoln );
Pipe laying line consists of 6 stations: 1 preprocessing station, 3 welding station, 1 inspection station, 1 preservative station.