Home > Achievements

  • Achievements

Achievements

 
  • Three phase 14 of Tianjin Port Economic Zone, Cofferdam and Backfilling Project on Lifting Pipe
    Customer:Tianjin Waterway Bureau Co., Ltd.
    Work Barge:‘Junhao 3’ pipe laying barge
    Location:Tianjin Port Economic Zone
    Duration:Jun.10~15, 2012
  • BZ25-1 Oil Permanent Reproduction Project Old Subsea Pipe Crude Oil Replacement Engineering
    Customer:Bohai Environmental Technology Services Company
    Work Barge:"Junhao 3"
    Location:Bohai Bay
    Duration:Oct.9~Nov.27, 2011
  • COF1-6 Subsea Pipe Cleaning Engineering
    Customer:Bohai Environmental Technology Services Company
    Work Barge:"Junhao 3"
    Location:Caofeidian 1-6 Oilfield area
    Duration:Sep.2011
  • JZ9-3W Flexible Pipe Laying Engineering
    Customer:Bohai Oil Harbor Engineering Co., Ltd.
    Work Barge:Junhao 3
    Location:Bohai Bay, CNOOC JZ9-3 Oilfield
    Duration:Nov.~Dec. 2010
  • Boxinan Network Supply of LNG Deep Trenching Engineering
    Customer:COOEC
    Work Barge:Junhao 3
    Location:Bohai Bay, Offshore areas
    Duration:Jul.31~Sep.26, 2010
  • Pipe Jacking and Tunneling of Shanghai LNG Subsea Pipeline Engineering
    Customer:Hyundai Heavy Industries Co., Ltd.(Korea)
    Work Barge:Pull Equipment
    Location:Nanhui District of Shanghai
    Duration:Sep.~Dec, 2008
  • SZ36-1 1 Adjustment Project Spool Piece Installation Engineering
    Customer:CNOOC
    Work Barge:TIANWEI
    Location:SZ36-1 Oil Field
    Duration:Aug.6 ~Nov.18,2009
  • SZ36-1 1 Adjustment Project Protection Cage of Three-way Wye Installation Engineering
    Customer:CNOOC
    Work Barge:Junhao 3
    Location:Liaodong Gulf, Liaoning Province
    Duration:Sep.21~27, 2009
  • SZ36-1 1 Adjustment Project Newly Increase Subsea Pipeline Post Trenching ( hard clay)
    Customer:CNOOC
    Work Barge:TIANWEI
    Location:BoHai Gulf, Liaoning Province, China
    Duration:Jul.1 ~ Aug.5, 2009
  • SZ36-1 1 Adjustment Project Newly Increase Subsea Pipeline Post Trenching Engineering
    Customer:CNOOC
    Work Barge:Junhao 3
    Location:Bohai Bay, China (Suizhong County, Liaoning Province)
    Duration:Jun.21 ~Aug.18, 2009
Pager.total 上一页 1 2 3 下一页