Achievements

 
  • NP1-29P to NP1-2D Subsea Cable Laying Engineering
    Customer:COOEC
    Work Barge:Yuhang Crane 18, Yuegong Tugboat 40, and Jingjingong 008
    Location:Bohai Bay, Jidong Oilfield Offshore areas
    Duration:Jul.23~Aug.7,2009
  • NP1-29P & NP1-2D Subsea Riser Installation Engineering
    Customer:COOEC
    Work Barge:Yuhang Crane 18, Yungang 2
    Location:Bohai Bay, Jidong Oilfield Offshore areas
    Duration:May.21~29,2009 and Jul.7~22,2009
  • NP1-29P to NP1-2D Subsea Pipeline Laying
    Customer:COOEC
    Work Barge:“Junhao3” Pipe Laying Barge, “Fumin18”, “Jingjingong008”
    Location:Bohai Bay, Jidong Oilfield Offshore areas
    Duration:Apr.20~June.2,2009
  • The Second Stage of A1/A2 Offshore Platform Installation Engineering: Offshore Platform Modular Installation
    Customer:SLECC (Shengli Engineering and Consultation Corporation)
    Work Barge:“Yuhang28”, “Fumin18”, “Jinjinggong008”
    Location:Panjin Offshore areas, Liaodong Bay
    Duration:Jun.12~Jul.12, 2009
  • Subsea Pipeline Post-trenching Engineering of Shanghai LNG
    Customer:Hyundai Heavy Industries Co., Ltd.(Korea)
    Work Barge:Junhao 3
    Location:Nanhui District of Shanghai, Offshore areas
    Duration:Oct. 2008~Feb. 2009
  • Subsea Pipeline Pull and Landing Engineering of Shanghai LNG
    Customer:Hyundai Heavy Industries Co., Ltd.(Korea)
    Work Barge:Pull Equipment
    Location:Nanhuizui and Ximentang, Nanhui District of Shanghai
    Duration:Sep.~Dec, 2008
  • The First Stage of A1/A2 Offshore Platform Installation Engineering: Pipe Guide Stand Installation and Piling
    Customer:SLECC (Shengli Engineering and Consultation Corporation)
    Work Barge:“Yuhang Crane 03” (Lifting Installation and Life Support)
    Location:Liaodong Bay, Liaoning Province, China
    Duration:Sep. ~ Nov.2008
  • Subsea Sewerage Pipeline Post-trenching Engineering of Fujian Refinery and Ethylene Project
    Customer:Shengli Oilfield Petroleum & Chemical Construction Corporation, Shengli Oilfield
    Work Barge:Junhao 3 (post-trenching with dropping/pulling anchors)
    Location:Meizhou Bay, Fujian Province, China
    Duration:Apr. ~ May.2008
  • Subsea Oil Pipeline Pre/Post-trenching of Fujian Refinery and Ethylene Project
    Customer:Shengli Engineering Design & Consulting Co., Ltd., Shengli Oilfield
    Work Barge:Junhao 3 (post-trenching with dropping/pulling anchors)
    Location:Meizhou Bay, Fujian Province, China
    Duration:Mar.2008~Jun.2008
  • Dongfang 1-1 Subsea Pipeline Emergency Rescue Engineering
    Customer:COOEC
    Work Barge:Junhao 3
    Location:Near Basuo Port, Hainan Province, China
    Duration:Nov.2007 ~ Jan.2008