The Second Stage of A1/A2 Offshore Platform Installation Engineering: Offshore Platform Modular Installation
Customer:SLECC (Shengli Engineering and Consultation Corporation)
Work Barge:“Yuhang28”, “Fumin18”, “Jinjinggong008”
Location:Panjin Offshore areas, Liaodong Bay
Duration:Jun.12~Jul.12, 2009